The weather was good this week so my foundation contractor was able to get the foundation poured. The bump out on the right is for the bulkhead and stairs down into the cellar.
I went up on Friday to tar the foundation. First I had to remove the metal tabs left over from the forms.
I decided to prime the spots where the metal tabs had been, with tar.
The next day I rolled waterproofing over the foundation.
Here is the view inside the foundation.
I'll head back up in 2 weeks to start the sills and floor joists.
It is exciting to see what was once a drawing on a piece of paper become a reality.