Spent a couple of hours cutting out the front door opening.
I needed to get the stall shower inside before installing the front door. 1 inch of clearance on each side!
Shower safely inside. It will most likely sit in a corner for the next year until the bathroom is done!
I ordered a simple 6 panel exterior door with glass in the top 2 panels at the local lumberyard. Door should be delivered in a week.
I started work on some temporary front steps. Eventually I plan to have a small screened in porch on the front of the house.